• 0

Project Consultancy, Reports & Profiles

Why should start a Business in Togo?

Reasons for beginning a business in Togo image result: In the most recent "Doing Business" list, Togo shines out. The country is among the top ten economies that have improved the most for the second year in a row. Togo has risen from 156th place in 2018 to 97th place in 2020, making it the best-performing West African country.

Togo will launch home-based companies. Online business concepts that are profitable. Togo offers one-of-a-kind business prospects. Low-cost company ideas (starting capital of less than $5,000).

 

What are the Natural Resources in Togo?

Phosphates (the principal source of foreign exchange), limestone, marble, and arable land are all natural resources. Coffee, cocoa, cotton, yams, cassava (tapioca), corn, beans, rice, millet, sorghum, livestock, and fish are examples of agricultural products. Togo has 21 recognized natural resources, according to figures from the CIA World Fact book. Gold is primarily found in the Dapping and Kara regions.

Gold is mined in a number of other countries as well. Togo also has limestone deposits in Atacama, Loma, and Adjarala; gypsum deposits in Akpro-Missérété; bauxite reserves in Kpogamè kaolin deposits in Kpalimé manganese ore in Bafilo phosphates in Kokoumbo; dolomite deposits in Ferkessédougou region; crude oil reserves in Ferkessédougou region; and crude oil reserves Aflao.

 

What are the Business Opportunities in Togo?

Togo is a country in West Africa that lies between the Gulf of Guinea and the Atlantic Ocean. Ghana is to the west, Burkina Faso is to the north, and Benin is to the east. Agriculture, unlike most other West African countries, plays a role in Togo's economy, but it also serves as a crucial export gateway for other bordering countries.

Fishing was one of Togo's most important sectors, accounting for over 80% of the country's total exports. Togo is also recognized for its phosphate output. Gold, marble, and limestone are examples of other natural resources.

 

What Businesses are successful in Togo?

Togo has a stable democratic political system, as well as an injection of investment, which has resulted in increased economic development. Despite the fact that manufacturing contributes significantly to GDP, other industries also play a significant contribution.

Cocoa, coffee, and cotton are among the agricultural crops farmed for export or domestic consumption. With roughly 600,000 people visiting each year from both established and developing countries, tourism is one of the fastest-growing areas of the economy. Mining is still a significant part of Togo's economy, accounting for more than a quarter of all exports.

The majority of mining takes place in Togo's southern regions. Construction materials such as marble and granite have been exploited since colonial times in addition to these natural resources. Limestone, salt, and sand are examples of other mineral resources. Businesses have expanded in recent years.

 

Is Togo Good for Business?

There are numerous advantages to starting a new business or purchasing an existing one in Togo. Because of the low cost of living, businesses may expand fast and affordably. Political stability, newly constructed infrastructure, and easy neighboring countries such as Nigeria and Ghana are making it simpler than ever for businesses to thrive. Startups have a lot of opportunities right now.

In recent years, the number of firms has doubled. As a result, as entrepreneurs seek possibilities in Togo, investment is at an all-time high. There are also numerous incentives available for investors; if you're trying to extend your business into West Africa, Togo is a great place to start access to markets.

 

Business-Friendly Policies and Government Initiatives of Togo:

In 2010, the government passed an investment code to make it easier for enterprises to get started and run. A new mining code is also being drafted by the government, which will offer clearer standards for how mining corporations can conduct business. Because of its strong reliance on imports for consumption items and capital equipment, as well as to finance its massive trade imbalance, the economy is extremely vulnerable to external shocks.

Togo's currency is fixed at 220 francs CFA (Comminute Financiered Africanize) per euro. Inflation rates were expected to be 4% in 2012 and 7% in 2013. 1. The government has worked to encourage investment by fostering an investor-friendly environment with a transparent legal structure and supporting private sector development.

It has also inked bilateral investment accords with France, Germany, Spain, Italy, Belgium, and Portugal, among other European countries. Togo is classified as a high-income country by the World Bank, with a GDP per capita of $1,500.

 

Togo Industrial Infrastructure:

Because of its strategic location on significant trade routes between Europe and Central Africa, Togo is a major commercial hub in West Africa. It has a growing industrial base, with industries producing textiles, wood goods, and drinks in particular. It has a port that allows for fishing and fish processing. Phosphates, limestone, marble, and iron ore are among the country's mineral resources.

Cocoa beans, coffee beans, cotton, and cashew nuts are the principal agricultural products. Natural gas reserves abound throughout the country, which are expected to fuel future economic expansion. Togo has become one of West Africa's fastest-growing economies as a result of all of these reasons.

The Ease of Doing Business in Togo: Despite its small economy (GDP of $5 billion in 2011), Forbes magazine ranks Togo as one of the most desirable countries for investors in Sub-Saharan Africa. This is attributable to the country's stable political climate and open legal system.

 

What are the steps for Starting a Business in Togo?

Register a Corporation - This stage is done by a notary public or registrar and is required before you can get any of these permits. You'll need to present a company name, which must include at least one shareholder and will be placed into the Commercial Register by either sort of notary. Each shareholder must have their own identity card and proof of address if there are numerous shareholders.

A private limited liability company's (Society à responsibility limited) minimum capital is around $1,500 USD, but this varies based on the type of business you want to start. Once you've registered, you're ready to go. The commercial register will send you a copy of your Certificate of Registration in about two weeks.

Obtain an EIN (Enterprise Identification Number): This number is used to identify a business that is just getting started.

 

Market Size of Togo:

Businesses in all sectors, including agriculture, are expected to have a total market size of $731 million. Agriculture contributes roughly 10% of GDP. For more than a decade, the government has pursued an economic liberalization programmed and maintained an open-market economy position in order to boost economic growth.

Global price changes for raw commodities (diamonds, gold, and phosphates), which account for a large portion of its exports. Togo's per capita income was estimated to be $1,300 by the World Bank. This places it among the most powerful countries in Sub-Saharan Africa.

However, with a population of only 6.5 million people, there is plenty of room for economic growth, and investment opportunities in mining, agribusiness, and other sectors abound. Textiles, as well as hospitality and restaurant services. Investors wishing to extend their activities into West Africa will find a welcoming atmosphere in the country.

It has a stable political environment, an English-speaking workforce, and low labor expenses. Furthermore, Togo's strategic location on trade routes connecting Europe and West Africa attracts investors seeking to serve the market.

 

Industrial Growth of Togo:

Togo's industrial sector has always been driven by demand for textile items. Textiles have become an increasingly important export business since 1984, when textile tariffs were reduced from 40% to 10%. Prior to 2004, textile imports far outnumbered exports; however, since 2004, exports have steadily outpaced imports, and the country became a net exporter in 2011.

By 2010, France accounted for 90% of textile exports, with the remaining 11% going to other European Union countries including Germany and Belgium. Processed food, in addition to textiles, is a significant export commodity. Food processing accounted for 12% of total industrial output and 4% of GDP in 2009.

In these fields, glees industries are leading the way. Textiles, as well as hospitality and restaurant services. Investors wishing to extend their activities into West Africa will find a welcoming atmosphere in the country. It has a stable political environment, an English-speaking workforce, and low labor expenses.

Furthermore, Togo's strategic location on trade routes connecting Europe and West Africa attracts investors seeking to serve the market. Meat processing (mainly beef), fish processing, oilseed crushing, sugar refining, rice milling, flour milling, pasta manufacture, vegetable oil extraction and bottling, soft drink bottling (Coca-Cola), brewing (Primus Beer), and canning are some of the most important sectors.

However, many of these businesses are small or home-based. There have been some investors in Toys in recent years. A significant amount of processed food is exported to neighboring countries such as Ghana and Benin. Outside of Loma, Togo has a slew of important manufacturing plants.


We can provide you detailed project reports on the following topics. Please select the projects of your interests.

Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.

We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.

Sort by :
A Business Plan for Silica Gel Crystal & Beads    from Sodium Silicate and Sulphuric Acid
A Business Plan for Silica Gel Crystal & Beads from Sodium Silicate and Sulphuric Acid

Silica Gel crystals & beads from sodium silicate and sulphuric acid are small porous granules made of silica. The process of manufacturing thes... Read More

Capacity :
Silica Gel Crystals & Beads 1000 MT Per Annum
Plant and Machinery cost:
504.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
912.00Lakhs
Add To Inquiry Basket
Biodegradable Plastic Bags  From Corn Starch Plant
Biodegradable Plastic Bags From Corn Starch Plant

Corn starch has 25% amylose and 75% amylopectin. The amylose molecules loose lose water increase biodegradation characteris... Read More

Capacity :
45 kg/hr
Plant and Machinery cost:
14.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Start Industry of Geogrid
Start Industry of Geogrid

Geogrid is a polymeric or steel-reinforced plastic grid material used to reinforce soils and create a stronger, more durabl... Read More

Capacity :
Geogrid 30,000 Sq.Mtrs Per Day
Plant and Machinery cost:
879.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
23.00%
Break Even Point (BEP):
43.00 %
TCI :
0.00 Lakhs
Cost of Project :
1766.00Lakhs
Add To Inquiry Basket
Start Herbicides Production From Artemisia Annua
Start Herbicides Production From Artemisia Annua

 

Artemisia annua, ... Read More

Capacity :
-
Plant and Machinery cost:
40.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
64.00 %
TCI :
0.00 Lakhs
Cost of Project :
370.00Lakhs
Add To Inquiry Basket
IV Fluid (Intravenous Fluid) Market (Southern and Eastern African Countries)
IV Fluid (Intravenous Fluid) Market (Southern and Eastern African Countries)


Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Setup Integrated Unit of Soya Nugget, Tea Packaging, Jam, Turmeric Grinding and Packaging
Setup Integrated Unit of Soya Nugget, Tea Packaging, Jam, Turmeric Grinding and Packaging

Four businesses that are now seeing great success in the market are soy nuggets, tea ... Read More

Capacity :
-
Plant and Machinery cost:
202.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
380.00Lakhs
Add To Inquiry Basket
Active Pharmaceutical Ingredients API • Metformin • Amoxicillin • Ibuprofen • Paracetamol Manufacturing Business
Active Pharmaceutical Ingredients API • Metformin • Amoxicillin • Ibuprofen • Paracetamol Manufacturing Business

The active ingredients in pharmaceutical medications that have a therapeutic effect o... Read More

Capacity :
-
Plant and Machinery cost:
275.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
12.00%
Break Even Point (BEP):
64.00 %
TCI :
0.00 Lakhs
Cost of Project :
963.00Lakhs
Add To Inquiry Basket
Manufacturing Business Of Polyacrylamide
Manufacturing Business Of Polyacrylamide

In many industrial and envi... Read More

Capacity :
Polyacrylamide Liquid 50% Solution 200 MT Per Day
Plant and Machinery cost:
2247.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
45.00 %
TCI :
0.00 Lakhs
Cost of Project :
4304.00Lakhs
Add To Inquiry Basket
Start Production of Zinc Chloride
Start Production of Zinc Chloride

 

An inorganic subs... Read More

Capacity :
Zinc Chloride from Zinc Ash 2,700 MT Per Annum Zinc Chloride from Zinc Oxide 300 MT Per Annum
Plant and Machinery cost:
229.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
55.00 %
TCI :
0.00 Lakhs
Cost of Project :
751.00Lakhs
Add To Inquiry Basket
Initiating an Integrated Unit of Soya Nugget, Tea Packaging, Turmeric Grinding & Packaging, Jam
Initiating an Integrated Unit of Soya Nugget, Tea Packaging, Turmeric Grinding & Packaging, Jam

A wide range of food processing operations are consolidated under o... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Setup Plant Of Aluminium from Bauxite
Setup Plant Of Aluminium from Bauxite

Aluminium is a lightweight ... Read More

Capacity :
Aluminium Ingot 10 MT Per Day
Plant and Machinery cost:
818.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
48.00 %
TCI :
0.00 Lakhs
Cost of Project :
2280.00Lakhs
Add To Inquiry Basket
Setup Unit Of Menthol Crystals From Mint Oil
Setup Unit Of Menthol Crystals From Mint Oil

Menthol crystals are a type of organic compound that have a cooling, minty aroma. The... Read More

Capacity :
Menthol Crystals 300,000 Kg. Per Annum Dementholised Oil (DMO) 100,000 Kg. Per Annum
Plant and Machinery cost:
154.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
63.00 %
TCI :
0.00 Lakhs
Cost of Project :
701.00Lakhs
Add To Inquiry Basket
A Business Plan For Sodium Sulphate (Anhydrous)
A Business Plan For Sodium Sulphate (Anhydrous)

Sodium sulfate, also known as sodium sulphate, is a white crystalline compound with t... Read More

Capacity :
Sodium Sulphate (Anhydrous) 10 MT Per Day HCl 32% 15 MT Per Day
Plant and Machinery cost:
54.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
336.00Lakhs
Add To Inquiry Basket
Start Manufacturing Business  Copper Flats & Copper Tubes
Start Manufacturing Business Copper Flats & Copper Tubes

Copper flats and copper tub... Read More

Capacity :
Copper Flats or Sections 2,000 MT Per Annum Copper Tubes 1,600 MT Per Annum Copper Scraps 55 MT P
Plant and Machinery cost:
353.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
1333.00Lakhs
Add To Inquiry Basket
Set up Dry Yeast For Bakery and Alcohol Industry
Set up Dry Yeast For Bakery and Alcohol Industry

 

Dry yeast is a ty... Read More

Capacity :
Dry Yeast 5,000 Kgs per day
Plant and Machinery cost:
1080.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
18.00%
Break Even Point (BEP):
53.00 %
TCI :
0.00 Lakhs
Cost of Project :
1703.00Lakhs
Add To Inquiry Basket
Setup Plant Of Pellet Production from waste Fishing Net (Recycling of fisheries plastic wastes)
Setup Plant Of Pellet Production from waste Fishing Net (Recycling of fisheries plastic wastes)

Fishing Net to Pellet refers to the innovative process of rec... Read More

Capacity :
Hdpe/Pvc/Nylon/Hdpe Pellet 2,000 MT Per Annum
Plant and Machinery cost:
114.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
64.00 %
TCI :
0.00 Lakhs
Cost of Project :
436.00Lakhs
Add To Inquiry Basket
Setup Unit Of Animal Feed From Bagasse
Setup Unit Of Animal Feed From Bagasse

Animal feed from bagasse re... Read More

Capacity :
Animal Feed 100 MT Per Day
Plant and Machinery cost:
125.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
53.00 %
TCI :
0.00 Lakhs
Cost of Project :
1320.00Lakhs
Add To Inquiry Basket
A Business Plan for Bottling of Refined Oil, Refined Sunflower Oil, Refined Corn Oil, RBD Palm Olein Oil, Extra Virgin Olive Oil
A Business Plan for Bottling of Refined Oil, Refined Sunflower Oil, Refined Corn Oil, RBD Palm Olein Oil, Extra Virgin Olive Oil

Bottling of refined oil refers to the process of packaging hi... Read More

Capacity :
-
Plant and Machinery cost:
402.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
1975.00Lakhs
Add To Inquiry Basket
Start Manufacturing Business  Manganese From Manganese Ore
Start Manufacturing Business Manganese From Manganese Ore

Manganese is a chemical ele... Read More

Capacity :
Manganese Ingot 10 MT Per Day
Plant and Machinery cost:
666.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
49.00 %
TCI :
0.00 Lakhs
Cost of Project :
2192.00Lakhs
Add To Inquiry Basket
Soda Ash Market of Middle East and North Africa (MENA)
Soda Ash Market of Middle East and North Africa (MENA)

Sodium carbonate, often known as soda ash, is a whit... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Start Production Of Calcium Silicate Blocks
Start Production Of Calcium Silicate Blocks

 

Calcium silicate ... Read More

Capacity :
Calcium Silicate Blocks 100 Sq.Mt. Per Day
Plant and Machinery cost:
82.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
62.00 %
TCI :
0.00 Lakhs
Cost of Project :
408.00Lakhs
Add To Inquiry Basket
Production of Sodium Hypochlorite
Production of Sodium Hypochlorite

 

Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
India High Silica Quartz Grit Market
India High Silica Quartz Grit Market

High silica quartz is a type of quartz that contains at least 97% SiO2. It is one of the most abundant minerals on Ear... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
A Business Plan For Packaged Drinking Water From Deep Sea Water
A Business Plan For Packaged Drinking Water From Deep Sea Water

 

Packaged drinking water means water derived from s... Read More

Capacity :
Packaged Drinking Water 80,000 Bottles per day
Plant and Machinery cost:
179.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
47.00 %
TCI :
0.00 Lakhs
Cost of Project :
1204.00Lakhs
Add To Inquiry Basket
Start a Business of Double Wall Corrugated Pipes
Start a Business of Double Wall Corrugated Pipes

Double wall corrugated (DWC) pipes are made from high-densit... Read More

Capacity :
Double Wall Corrugated Pipes 20 MT Per Day
Plant and Machinery cost:
449.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
49.00 %
TCI :
0.00 Lakhs
Cost of Project :
1271.00Lakhs
Add To Inquiry Basket
Set A Paint Rollers Manufacturing Business
Set A Paint Rollers Manufacturing Business

Paint rollers are one of the best ways to get a professional... Read More

Capacity :
Paint Roller 8,000 Pcs Per Day
Plant and Machinery cost:
34.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
61.00 %
TCI :
0.00 Lakhs
Cost of Project :
227.00Lakhs
Add To Inquiry Basket
A Business Plan for Biodegradable Disposable Cups and Plates (Tableware) Using Sugarcane Bagasse
A Business Plan for Biodegradable Disposable Cups and Plates (Tableware) Using Sugarcane Bagasse

 

Bagasse is primarily found in countries that produ... Read More

Capacity :
Biodegradable Disposable Cups 555.5 Th. Pcs Per Day Biodegradable Disposable Plates 312.5 Th. Pcs Pe
Plant and Machinery cost:
1924.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
46.00 %
TCI :
0.00 Lakhs
Cost of Project :
2789.00Lakhs
Add To Inquiry Basket
Fatty Alcohol Manufacturing Business Plan
Fatty Alcohol Manufacturing Business Plan

Fatty alcohols, also known as aliphatic alcohols, are slight... Read More

Capacity :
Fatty Alcohol 40 MT Per Day By Product (RBD) Palm Oil 45 MT Per Day
Plant and Machinery cost:
800.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
46.00 %
TCI :
0.00 Lakhs
Cost of Project :
5600.00Lakhs
Add To Inquiry Basket
Activated Carbon From Rice Husk Saw Dust & Coconut Shell Manufacturing Business Plan
Activated Carbon From Rice Husk Saw Dust & Coconut Shell Manufacturing Business Plan

 

Activated carbon is a type of carbon that has been... Read More

Capacity :
Activated Carbon 2,000 Kg Per Day
Plant and Machinery cost:
334.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
41.00 %
TCI :
0.00 Lakhs
Cost of Project :
606.00Lakhs
Add To Inquiry Basket
Start a Production Business of Rubber Granules from Waste Tyre  Time to Start Your Own Production Business of Rubber Granules from Waste Tyre
Start a Production Business of Rubber Granules from Waste Tyre Time to Start Your Own Production Business of Rubber Granules from Waste Tyre

Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Manufacturing Business of uPVC and CPVC Pipes
Manufacturing Business of uPVC and CPVC Pipes

PVC material is used to cre... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Start Now Own Banana Wine Production Business Banana Products Manufacturing Business Ideas
Start Now Own Banana Wine Production Business Banana Products Manufacturing Business Ideas

A sort of alcoholic beverage created from bananas is called Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Manufacturing Business Of Triacetin
Manufacturing Business Of Triacetin

 

Triacetin, also k... Read More

Capacity :
5,000 MT Per Annum
Plant and Machinery cost:
2206.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
62.00 %
TCI :
0.00 Lakhs
Cost of Project :
3524.00Lakhs
Add To Inquiry Basket
Set Up E-Waste Recycling Plant
Set Up E-Waste Recycling Plant

 

If you haven&rsqu... Read More

Capacity :
1,41,000 Kgs per annum 1,05,900 Kgs per annum 88,200 Kgs per annum 18,000 Kgs per annum 5.760
Plant and Machinery cost:
107.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
336.00Lakhs
Add To Inquiry Basket
The Most Amazing and Easy Business Plan of Creamy Peanut Butter Manufacture Start Now Creamy Peanut Butter Production
The Most Amazing and Easy Business Plan of Creamy Peanut Butter Manufacture Start Now Creamy Peanut Butter Production

The Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Moringa Leaf Powder business Start Now Agriculture Based Moringa Leaves Powder Business Opportunity
Moringa Leaf Powder business Start Now Agriculture Based Moringa Leaves Powder Business Opportunity

The Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Business Plan Of ISO Freight Containers Manufacturing
Business Plan Of ISO Freight Containers Manufacturing

The industry standard for shipping is ISO Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Beneficial Business Idea for Ginger Oil & Ginger Powder Start Today Great Business Opportunity of Ginger Oil & Ginger Powder
Beneficial Business Idea for Ginger Oil & Ginger Powder Start Today Great Business Opportunity of Ginger Oil & Ginger Powder

Although ... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Setting up Aluminium Cans for Beverages (Two Pieces) Business
Setting up Aluminium Cans for Beverages (Two Pieces) Business

 

Aluminium cans are one of the most popular con... Read More

Capacity :
Aluminium Cans for Beverages Each 330 ml Size: 3,450 Lakh Pcs per Annum
Plant and Machinery cost:
2605.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
40.00 %
TCI :
0.00 Lakhs
Cost of Project :
7760.00Lakhs
Add To Inquiry Basket
Startup Business of Sorbitol
Startup Business of Sorbitol

Sorbitol is a sugar alcohol... Read More

Capacity :
Sorbitol 3,000 MT Per Annum
Plant and Machinery cost:
58.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
55.00 %
TCI :
0.00 Lakhs
Cost of Project :
575.00Lakhs
Add To Inquiry Basket
Production Business uPVC and CPVC Pipes
Production Business uPVC and CPVC Pipes

UPVC is a type of plastic p... Read More

Capacity :
CPVC Pipes 50 mm 1,200 MT Per Annum uPVC Pipes 150 mm 2,400 MT
Plant and Machinery cost:
313.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
56.00 %
TCI :
0.00 Lakhs
Cost of Project :
714.00Lakhs
Add To Inquiry Basket
Setup IV Fluid (FFS Technology) Business
Setup IV Fluid (FFS Technology) Business

IV fluid is a watery soluti... Read More

Capacity :
0
Plant and Machinery cost:
4205.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
40.00 %
TCI :
0.00 Lakhs
Cost of Project :
5770.00Lakhs
Add To Inquiry Basket
Ferro Alloys, Ferro Silicon, High Carbon Ferro Manganese, Silico Manganese Production Business
Ferro Alloys, Ferro Silicon, High Carbon Ferro Manganese, Silico Manganese Production Business

 

Ferroalloys are alloys consisting of a combina... Read More

Capacity :
0
Plant and Machinery cost:
15692.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
54.00 %
TCI :
0.00 Lakhs
Cost of Project :
24627.00Lakhs
Add To Inquiry Basket
Start Your Own Business Of Auto Brake Pad And Brake Shoe
Start Your Own Business Of Auto Brake Pad And Brake Shoe

The greatest component of a car's braking system is the Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Start production of E-Rickshaw and E-Loader
Start production of E-Rickshaw and E-Loader

An E-Rickshaw is an electric vehicle used as a public transportation. It is an economical, efficient and eco-friendly ... Read More

Capacity :
E-Rickshaw: 6,000 Nos Per Annum, E-Loader: 3,000 Nos Per Annum
Plant and Machinery cost:
56.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
34.00%
Break Even Point (BEP):
42.00 %
TCI :
0.00 Lakhs
Cost of Project :
1170.00Lakhs
Add To Inquiry Basket
Disposable Plastic Syringes with Needles  Manufacturing Plant
Disposable Plastic Syringes with Needles Manufacturing Plant

Disposable plastic syringes with needles are a type of medical device used to inject fluids into or draw ... Read More

Capacity :
-
Plant and Machinery cost:
2533.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
36.00 %
TCI :
0.00 Lakhs
Cost of Project :
5405.00Lakhs
Add To Inquiry Basket
Growing Business of Mix Plaster, Block Jointer, Tile Adhesive and M 20 Concrete (Micro Concrete)
Growing Business of Mix Plaster, Block Jointer, Tile Adhesive and M 20 Concrete (Micro Concrete)

 

Important building supp... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Start A Business And Change The World, So Now! Start Your Own Lucrative Business of Protein Based Nutrition Foods
Start A Business And Change The World, So Now! Start Your Own Lucrative Business of Protein Based Nutrition Foods

Foods with a high Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Here Are Some Great Tips on How to Get Started In the Ferro Alloys, Ferro Silicon High Carbon, Ferro Manganese, Silico Manganese Industry
Here Are Some Great Tips on How to Get Started In the Ferro Alloys, Ferro Silicon High Carbon, Ferro Manganese, Silico Manganese Industry

What Are Ferro Alloys, Ferro Silicon High Carbon, Fer... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Start a Production  Of Carbon Black N990
Start a Production Of Carbon Black N990

Carbon Black N990 is a highly versatile and durable form of carbon black, which has been specially formulated ... Read More

Capacity :
Carbon Black (N990): 8,000 MT Per Annum
Plant and Machinery cost:
4900.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
18.00%
Break Even Point (BEP):
63.00 %
TCI :
0.00 Lakhs
Cost of Project :
6200.00Lakhs
Add To Inquiry Basket
Setup plant of Glass Fiber Reinforced Polymer (GFRP) Rebar
Setup plant of Glass Fiber Reinforced Polymer (GFRP) Rebar

Glass fiber reinforced polymer (GFRP) rebar is a... Read More

Capacity :
Glass Fibre Reinforced Polymer (GFRP) Bar (Size 8mm to 36 mm): 360,000 MT Per Annum
Plant and Machinery cost:
600.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
34.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
6100.00Lakhs
Add To Inquiry Basket
Start Manufacturing Business Of L-Glutamic Acid And Monosodium Glutamate
Start Manufacturing Business Of L-Glutamic Acid And Monosodium Glutamate

 

L-Glutamic acid a... Read More

Capacity :
L-Glutamic Acid 50 MT Per Day Monosodium Glutamate 15 MT Per Day
Plant and Machinery cost:
867.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
2590.00Lakhs
Add To Inquiry Basket
Business Plan For Sanitary Napkins
Business Plan For Sanitary Napkins

Feminine napkins, generally called sanitary napkins or menstruation pads, are absorbe... Read More

Capacity :
Sanitary Napkins 1,440,000 Pkts Per Annum
Plant and Machinery cost:
26.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
66.00 %
TCI :
0.00 Lakhs
Cost of Project :
84.00Lakhs
Add To Inquiry Basket
Start Production of Expandable & High Purity Graphite
Start Production of Expandable & High Purity Graphite

Expandable Graphite refers to a form of graphite that has bee... Read More

Capacity :
Expandable Graphite 10 MT Per Day High Purity Graphite 10 MT Per Day
Plant and Machinery cost:
206.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
49.00 %
TCI :
0.00 Lakhs
Cost of Project :
1598.00Lakhs
Add To Inquiry Basket
Start  Waste Lubricating Oil Recycling Plant
Start Waste Lubricating Oil Recycling Plant

Waste Lubricating Oil Recyc... Read More

Capacity :
Recycled Lubricating Oil 18,000 KLs per Annum Spent Clay as by product 1,890 KLs per Annum
Plant and Machinery cost:
355.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
32.00 %
TCI :
0.00 Lakhs
Cost of Project :
3101.00Lakhs
Add To Inquiry Basket
Start Manufacturing Of Carbon Composite Bicycle
Start Manufacturing Of Carbon Composite Bicycle

Carbon composite bicycles a... Read More

Capacity :
Carbon Composite Bicycle 12 Nos per Day
Plant and Machinery cost:
413.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
594.00Lakhs
Add To Inquiry Basket
Start Manufacturing Of Latex Toy Balloons
Start Manufacturing Of Latex Toy Balloons

Latex toy balloons are flexible, inflatable objects made prim... Read More

Capacity :
Latex Toy Balloons 20,000 PKTS per Day
Plant and Machinery cost:
373.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
883.00Lakhs
Add To Inquiry Basket
Setup Plant Of Craft Beer
Setup Plant Of Craft Beer

 

Craft beer is a t... Read More

Capacity :
-
Plant and Machinery cost:
1519.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
42.00 %
TCI :
0.00 Lakhs
Cost of Project :
4060.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
Start a Production Of Com... Compressed Bio Gas 6 MT Per Day Spent Slurry as Manure 60 MT Per Day 27.00 522.00
Start Industry Of Craft B... Craft Beer (Bottles 650 ml Size) 3,847 Bottles per day Craft Beer (Al. Cans 500 ml Size) 5,000 Bot 27.00 2007.00
Setup plant of Acetate T... Acetate Tow 8 MT Per Day 29.00 1426.00
Setup Plant Of Titanium ... Titanium Dioxide 4 MT Per Day 27.00 1455.00
Setup Plant Of Lab Cultu... Lab Cultured Diamonds (1 Carat) 30 Carat Per Day 25.00 361.00
Start Lemon Processing Un... Lemon Juice Dry Powder 104 Kgs per day Lemon Peel Oil 40 Kgs per day Lemon Pectin 140 Kgs 25.00 314.00
Solar PV (Photovoltaic) G... Solar PV (Photovoltaic) Glass 90,000 MT Per Annum 28.00 4200.00
A Business Plan For Pea P... Pea Protein Isolate 2 MT Per Day Spent Pea for Cattle Feed by Product 8 MT Per Day 27.00 614.00
Setup Plant Of Acrylate... Acrylate Resins 10,000 MT Per Annum Acrylate Emulsions 10,000 MT Per Annum 30.00 2291.00
Start Latex Rubber Thread... Latex Rubber Thread 200 Kg. Per Day 26.00 412.00
Start Cosmetic Unit (Seru... - 36.00 1617.00
Pioneering Pea Protein Bu... 0 0.00 0.00
Start Production Of Silic... - 28.00 4716.00
A Business Plan for IV Fl... IV Fluids (500 ml Size Pack) 78,000 Packs Per Day 27.00 1263.00
Start Industry of Liquor ... Wine (750 ml Size) 4,000,000 Bottles per annum Whiskey (375 ml Size) 4,000,000 Bottles per annum B 28.00 1880.00
Setup Pharmaceutical Unit... - 37.00 35774.00
Start Industry with Serum... 0 0.00 0.00
Setup Unit Of Cement Plan... Cement Plant 40,000 Bags per Day 26.00 25200.00
A Business Plan for Steri... Sterial Water for Injection 500 ml Size Pack 20,000 Sachets Per Day 30.00 1234.00
Setup Plant Of Lead From ... Lead Ingot 30 MT Per Day 28.00 2231.00
A Business Plan Blood Col... - 28.00 2294.00
A Business Plan for Parac... Paracetamol Powder 7 MT Per Day 27.00 779.00
Start Manufacturing Busin... Baby Diapers (4 Pcs.) 84,000 Pkts Per Day Adult Diapers (4 Pcs.) 18,000 Pkts Per Day Sanitary 29.00 4201.00
Start Tissue Paper Manufa... Tissue Paper 20 MT Per Day 27.00 2101.00
Launching a Solar Panel ... Solar Panel 500 MW per annum 32.00 5353.00
Biodegradable Disposable ... - 27.00 2774.00
Setup Curcumin Extraction... Curcumin Powder 100 Kgs per day Turmeric Oil 47 Kgs per day Deoiled Turmeric 1,853 Kgs 28.00 491.00
Setup Active Pharmaceutic... Paracetamol 10,000 Kgs Per Day Azithromycin 10,000 Kgs Per Day Metformin 10,000 Kgs 33.00 5246.00
A Business Plan For Sanit... Sanitary Napkins 4,800 PKTS per day 27.00 84.00
Start Manufacturing Of Bl... - 32.00 985.00
12345678910...

Showing 481 - 540 of 919 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report, Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

And before diversifying/venturing into any product, wish to study the following aspects of the identified product:
  • Good Present/Future Demand
  • Export-Import Market Potential
  • Raw Material & Manpower Availability
  • Project Costs and Payback Period

We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

Reasons for buying the report:
  • This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.
  • This report provides vital information on the product like its definition, characteristics and segmentation.
  • This report helps you market and place the product correctly by identifying the target customer group of the product.
  • This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.
  • The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.
The report contains all the data which will help an entrepreneur find answers to questions like:
  • Why I should invest in this project?
  • What will drive the growth of the product?
  • What are the costs involved?
  • What will be the market potential?

The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product. The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.

  • Our research reports broadly cover Indian markets, present analysis, outlook and forecast.
  • The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players.
  • We use reliable sources of information and databases. And information from such sources is processed by us and included in the report.

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

Introduction
  • Project Introduction
  • Project Objective and Strategy
  • Concise History of the Product
  • Properties
  • BIS (Bureau of Indian Standards) Provision & Specification
  • Uses & Applications
Market Study and Assessment
  • Current Indian Market Scenario
  • Present Market Demand and Supply
  • Estimated Future Market Demand and Forecast
  • Statistics of Import & Export
  • Names & Addresses of Existing Units (Present Players)
  • Market Opportunity
Raw Material
  • List of Raw Materials
  • Properties of Raw Materials
  • Prescribed Quality of Raw Materials
  • List of Suppliers and Manufacturers
Personnel (Manpower) Requirements
  • Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel
Plant and Machinery
  • List of Plant & Machinery
  • Miscellaneous Items
  • Appliances & Equipments
  • Laboratory Equipments & Accessories
  • Electrification
  • Electric Load & Water
  • Maintenance Cost
  • Sources of Plant & Machinery (Suppliers and Manufacturers)
Manufacturing Process and Formulations
  • Detailed Process of Manufacture with Formulation
  • Packaging Required
  • Process Flow Sheet Diagram
Infrastructure and Utilities
  • Project Location
  • Requirement of Land Area
  • Rates of the Land
  • Built Up Area
  • Construction Schedule
  • Plant Layout and Requirement of Utilities
Assumptions for Profitability workings
Plant Economics
Production Schedule
Land & Building
  • Factory Land & Building
  • Site Development Expenses
Plant & Machinery
  • Indigenous Machineries
  • Other Machineries (Miscellaneous, Laboratory etc.)
Other Fixed Assets
  • Furniture & Fixtures
  • Pre-operative and Preliminary Expenses
  • Technical Knowhow
  • Provision of Contingencies
Working Capital Requirement Per Month
  • Raw Material
  • Packing Material
  • Lab & ETP Chemical Cost
  • Consumable Store
Overheads Required Per Month And Per Annum
  • Utilities & Overheads (Power, Water and Fuel Expenses etc.)
  • Royalty and Other Charges
  • Selling and Distribution Expenses
Salary and Wages
Turnover Per Annum
Share Capital
  • Equity Capital
  • Preference Share Capital
Annexure 1:: Cost of Project and Means of Finance
Annexure 2:: Profitability and Net Cash Accruals
  • Revenue/Income/Realisation
  • Expenses/Cost of Products/Services/Items
  • Gross Profit
  • Financial Charges
  • Total Cost of Sales
  • Net Profit After Taxes
  • Net Cash Accruals
Annexure 3 :: Assessment of Working Capital requirements
  • Current Assets
  • Gross Working. Capital
  • Current Liabilities
  • Net Working Capital
  • Working Note for Calculation of Work-in-process
Annexure 4 :: Sources and Disposition of Funds
Annexure 5 :: Projected Balance Sheets
  • ROI (Average of Fixed Assets)
  • RONW (Average of Share Capital)
  • ROI (Average of Total Assets)
Annexure 6 :: Profitability ratios
  • D.S.C.R
  • Earnings Per Share (EPS)
  • Debt Equity Ratio
Annexure 7 :: Break-Even Analysis
  • Variable Cost & Expenses
  • Semi-Var./Semi-Fixed Exp.
  • Profit Volume Ratio (PVR)
  • Fixed Expenses / Cost
  • B.E.P
Annexure 8 to 11:: Sensitivity Analysis-Price/Volume
  • Resultant N.P.B.T
  • Resultant D.S.C.R
  • Resultant PV Ratio
  • Resultant DER
  • Resultant ROI
  • Resultant BEP
Annexure 12 :: Shareholding Pattern and Stake Status
  • Equity Capital
  • Preference Share Capital
Annexure 13 :: Quantitative Details-Output/Sales/Stocks
  • Determined Capacity P.A of Products/Services
  • Achievable Efficiency/Yield % of Products/Services/Items
  • Net Usable Load/Capacity of Products/Services/Items
  • Expected Sales/ Revenue/ Income of Products/ Services/ Items
Annexure 14 :: Product wise domestic Sales Realisation
Annexure 15 :: Total Raw Material Cost
Annexure 16 :: Raw Material Cost per unit
Annexure 17 :: Total Lab & ETP Chemical Cost
Annexure 18 :: Consumables, Store etc.,
Annexure 19 :: Packing Material Cost
Annexure 20 :: Packing Material Cost Per Unit
Annexure 21 :: Employees Expenses
Annexure 22 :: Fuel Expenses
Annexure 23 :: Power/Electricity Expenses
Annexure 24 :: Royalty & Other Charges
Annexure 25 :: Repairs & Maintenance Exp.
Annexure 26 :: Other Mfg. Expenses
Annexure 27 :: Administration Expenses
Annexure 28 :: Selling Expenses
Annexure 29 :: Depreciation Charges – as per Books (Total)
Annexure 30 :: Depreciation Charges – as per Books (P & M)
Annexure 31 :: Depreciation Charges - As per IT Act WDV (Total)
Annexure 32 :: Depreciation Charges - As per IT Act WDV (P & M)
Annexure 33 :: Interest and Repayment - Term Loans
Annexure 34 :: Tax on Profits
Annexure 35 ::Projected Pay-Back Period And IRR